After successful sea trials a few weeks ago, she’s back out of the water as the Marlow Team works to complete the final details and boy is there a lot of details to finish up. This week we see that the mattresses have been installed in the three staterooms along with the cushions in the Galley and Command Bridge.
If you look closely, you might see yellow tape stuck to the walls in a few of the rooms. This is where the Quality Control team has gone thru and marked any ares that need some additional attention by the Varnish team.
Take a look at the built in step that they created for the 3rd Stateroom. We asked for a step that was built in but hidden so we didn’t have a loose step stool bouncing around while underway. This is what they came up with – a pull out drawer that acts as a step for guests to get up and down from the bunks. It can be stored back in the cabinet when not in use and also includes a pull out drawer underneath! They have been so creative and accommodating with our requests on this build that has left us very impressed!
2 comments
That step in the third stateroom is genius
Thanks Susan! They continue to amaze us with how they utilize every space!